C.S.I. Divisions
Cost
% of Cost
Sq.Ft. Cost
Procurement & Contractural Requirements
301,400
1.81
3.53
1.
1.
General Requirements
46,200
0.28
0.54
3.
3.
Concrete
1,600,000
9.63
18.75
4.
4.
Masonry
2,176,000
13.10
25.49
5.
5.
Metals
1,300,000
7.83
15.23
6.
6.
Wood, Plastics and Composites
130,000
0.78
1.52
7.
7.
Thermal & Moisture Protection
1,600,000
9.63
18.75
8.
8.
Openings
600,000
3.61
7.03
9.
9.
Finishes
1,050,000
6.32
12.30
10.
10.
Specialties
200,000
1.20
2.34
11.
11.
Equipment
350,000
2.11
4.10
12.
12.
Furnishings
470,000
2.83
5.51
14. 14. Conveying Systems
70,000
0.42
0.82
15. 21. Fire Suppression
256,000
1.55
3.00
15. 22. Plumbing
762,000
4.59
8.93
15. 23. HVAC
2,724,000
16.40
31.91
16. 26. Electrical
2,002,542
12.06
23.46
16. 27. Telecommunications
607,597
3.66
7.12
16. 28. Electronic Safety and Security
362,861
2.19
4.25
     
    TOTAL BUILDING COSTS 16,608,600
100
194.58

» More Cost Information »

System Information

 
PSU AE Senior Thesis Home
The Pennsylvania State Univeristy
Architectural Engineering Department
PSU AE Computer Lab
Resume

 
Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work-in-progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Amanda Cronauer. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design